After-sales Service: | 1 Year |
---|---|
Warranty: | 1 Year |
Type: | Jack |
Still deciding? Get samples of US$ 180/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Prestressing mono jack is one of the indispensable and important tools in the tension-anchorage construction of Prestressing bridge project.
Prestressing Mono jack is mainly used for single hole tensioning, but can also be used for multi-hole pretensioning, tensioning and obstacle removal.
Prestressing Mono jack is suitable for a variety of sizes of high strength wire bundles and strands.
Item | Unit | Value |
Nominal tension | KN | 257 |
Nominal oil pressure | MPA | 50 |
Tension piston area | M2 | 5.137*10 |
Return piston area | M2 | 1.335*10 |
Piercing hole diameter | MM | 19 |
Trolley trip | MM | 200 |
Dimensions | MM | 180*568 |
Return oil pressure | MPA | Less than or equal to 25 |
1, Prestressing Mono jack belongs to the jack in front of the tool anchor, which can save prestressing tendon material.
2, Prestressing Mono jack comes with a lot of different gaskets.
3, Prestressing Mono jack can achieve automatic clamping of prestressed tendons and anchorage, so as to reduce labor intensity and improve the efficiency of prestressed tension.
4, Prestressing Mono jack working to prevent the rotation of the steel strand, to avoid the elongation of the steel strand is too large.
Shaanxi Saifusite Mechanical Electrical Equipment Co., is a professional company which engaged in researching, developing, manufacturing hydraulic mining equipment, hydraulic construction machinery equipment, ultra-high pressure pumping station, cylinder and other mine equipment.Since the company since its inception, has been in line with the concept of quality first, reputation first, with high quality and thoughtful service return customers and society.
Q1: Warranty terms of your machine?
A1: One-year warranty for the machine and technical support according to your needs.
Q2: Will you provide some spare parts for the machines?
A2: Yes, of course.
Q3: What about the voltage of products? Can they be customized?
A3: Our standard voltage is 380V, 50HZ, and 3phase. The voltage can be customized according to your equipment.
Q4: Which payment term can you accept?
A4: 100% T/T( Decide according to actual situation)
Q5: How long will it take to arrange production?
A5: we can deliver the normal goods within 3-5 working days. Other nonstandard electrical items we will deliver within 25-30 days.
Q6: Can you accept OEM orders?
A6: Yes, with a professional design team, OEM orders are highly welcome.
Q7: Which trade term can you accept?
A7: Available trade terms: FOB, CIF, CFR, EXW, etc.